武汉纳思系统技术有限公司



Using laser technology to track railway  without human monitoring

•Processing the whole back massive data, and warning all the abnormal situations of track

Data modeling all back data, visualization the entire track

•Standardization the terminal and server process, and make easily docking and extensions between systems

TRACK MONITORING

TRACK MONITORING

TRACK MONITORING



The security of railway network is an important guarantee for the national economic development, defense and security. Conventional test of strain, subgrade settlement of railway track needs to be done manually during nonoperating time, which leads low efficiency of operation and large workload maintenance. Affected by climate, it’s difficult to detect small changes, and the accident alert cannot be found timely. How to solve these problems? “Non-contract Precision Monitoring for Track”had been proposed.



By non- contact laser pulse transmitter & receiver, mathematical modeling and the matching, intelligent extraction, fault-tolerant mass, the Non-contract Precision Monitoring system can finished non-contact data acquisition 24hours timely and detect physical abnormalities in time. Provide track maintenance, accident warning for scientific analysis, which reducing the risk of potential track maintenance and improve the efficiency and guarantee the safe operation of the track.